Xponent | Ultramain — Aviation » Transit » Facilities
AVIATION CAPABILITIES LIST
| Maintenance |
| |
Configuration Management
- Configuration Model Definition
- Revision Control and Approval Routing/Workflow
- Cross-Slot Dependencies
- End Item Effectivity
- Modification Campaign Management
- Modification Status Management
- Installation Validation and Exception Management
- As-Built and As-Maintained Management
|
Maintenance Requirements
- Letter Checks and Phasing
- Check Aligned and Out of Phase
- ADs, SBs, and EOs
- CPCP and SSI
- Component Maintenance Requirements
- Revision Control and Approval Routing/Workflow
- Compliance History and Auditing
|
Maintenance Procedures
- Task Definitions
- Labor, Parts, Equipment, and Tooling
- Instructions, including Embedded Graphicss
- Links to AMM Task and Subtask
- Task Card and Work Package Printing
- ePubs Interface and Hyperlinks
- Revision Control and Approval Routing/Workflow
|
Planning and Forecasting
- Line Maintenance Planning and Work Packaging
- Base/Heavy Maintenance Planning and Packaging
- Estimating
- Capacity Planning
|
Production Planning and Control
- Base/Heavy Maintenance
- Line Maintenance
- Workshop Maintenance
- Work Assignment and Monitoring
- Task Clock-On, Clock-Off, and Sign-Off
- Non-Routine Management - Billing
|
Flight Logs
- Technical Log
- Cabin Log
- CMC/FDE ACARS Downloads
- Flight Schedule Interface
- MEL and Deferral Control Management
|
Maintenance Alerting and Analysis
- Repetitive Defect Alerting/Workflow
- CMC/FDE Alerting/Workflow
- Fluid Trend Analysis and Alerting
- Cost Analysis
- Reliability Analysis
|
Labor Management
- Authorizations and Access Control
- Craft, Skill, and Proficiency Tracking
- Training and Certifications
- Work Schedules
- Time and Attendance
|
Asset Management
- Asset Definitions and Family Trees
- Cost Analysis and Valuation
- Downtime Analysis
- Replacement Analysis
- Depreciation
|
|
| Logistics |
| |
Materials Management
- Stock Control and Workflow
- Warehouse Management
- Spares Management and Pooling
- Materials Requirement Planning
- Stock Replenishment
- Ownership Control
- Tool Control
- Loans and Borrows
- Depreciation Tracking
- Service Level Tracking
- Stock Valuation
- Accounting Interfaces
- Rogue Unit Management
|
Procurement
- Purchase Requisitions
- Vendor Bids and Quotes
- Contracts and Purchase Orders
- Lease and Consignment
- SPEC2000
- Repair and Exchange Orders
- Invoicing and Three-Way Match
- Vendor Management and Analysis
- Approval Routing/Workflow
|
Warranty Management
- Purchase and Repair Coverage Tracking
- Claim Candidate Alerting/Workflow
- Claim Processing
- Multiple Claim Types, including Incident/Damage Claims
- Claim Response and Reimbursement Tracking
|
Quality Assurance
- Program Management
- Non-Conformance Management
- Audit Tracking
- Corrective Action Plans
- Receipt Inspection and Quarantine
|
|